info@designmind.co.za 083 454 1620

logo

 

LOGIN INTO YOUR ACCOUNT

 

BUILD NEWS

All news Interior & Decor News Design News Landscape News Property News Build News
 
Friday, 20 January 2017 19:34

Cost per square metre

Written by 
Rate this item
(0 votes)

COST PER SQUARE METRE

Building cost per square meter - Brick and Mortar

COST PER SQUARE METRE

COST PER SQUARE METRE - BRICK & MORTAR OR CONVENTIONAL CONSTRUCTION

 

Cost per square meter | Building Cost | Construction cost

The shape of a building has an important effect on cost. As a general rule the simpler the shape of a building, the lower will be its unit cost. Let us illustrate this as follows:  This determines the cost per square meter of building

BUILDING SHAPES

Regular shapes in contrast, become more expensive the longer and narrower they are planned. This can be illustrated by the following examples of a square and rectangular building with the same floor area.

cost per square meter

Cost Per Square Meter

BUILDING A           BUILDING B

Example of how building cost per square meter can vary

BUILDING A

Area on plan = 400m²
Length of walling = 80m
Assume 3m high walling @ Currency 200.00/m²

Then cost/m² = 80 x 3 x 200 ÷ 400 

= Currency 120.00/m² - cost per square meter

BUILDING B

Area on plan = 400m²
Length of walling = 208m
Assume 3m high walling @ Currency 200.00/m²

Then cost/m² = 208 x 3 x 200 ÷ 400
= Currency 312.00/m² - cost per square meter

The length of Building B thus resulted in an additional expense of Currency 76,800.00 over that of Building A influencing cost per square meter

Both plans have exactly the same floor areas, yet BUILDING B is far more expensive due to the shape of its design. Reasons for the increase in costs are:

 

  • Building B has a higher perimeter/floor area ratio (to be discussed in more detail later) and requires 6% more external walling to enclose the same floor area than A.
  • Setting out costs will be increased by as much as 50%.
  • Excavations will cost between 6% and 20% more.
  • Drainage costs will increase by approximately 25% due to the extra manholes and extra length of piping needed.
  • Additional costs will also result from other elements of the building such as the walling and roofing due to the work being complicated by the shape.

 

It can therefore be concluded that the irregular shapes of buildings add to their overall cost.
 

SOLUTION TO MANAGE COST

Control Cost with moladi Technology

Control Cost with moladi Technology

With moladi as a construction technology - cost can be minimised and reduced due to the speed achieved to produce the completed units - In order to compile a cost estimate visit moladi cost estimate

Keywords - Cost per square metre, moladi, Cost per square meter, shape of a building, Rand, Dollar, R, $, building, construction, area, house, low cost housing, rate,shape of a building,housing, floor area, finishes

Read 902 times Last modified on Friday, 20 January 2017 23:22
moladi

moladi - Plastic Formwork -low cost housing affordable Housing building construction

Related items

  • How to get South Africa WORKING

    How to get South Africa WORKING

     A "TOOL" to get the unemployed working - Fight unemployment, hunger and crime through housing

    The backlog for Affordable Housing in South Africa are in the millions. The main culprit in increased cost and affordability is "skilled labour*. The lack of artisans in the construction trade continuously escalates due to the fact that there are no new "apprentices" enrolling. Bricklayers and plasterers are only two of the key artisans that effect the cost of building.

    moladi has embarked on developing technology primarily to reduce the dependence on skilled labour in order to reduce cost of construction, and also to increase production quality consistently eliminating costly rework.

    Although moladi formwork technology is primarily a manufacturer of a re-useable machine made patented formwork system that allows walls to be cast stronger faster for less, the principal focus is on the delivery of the “whole house”. A house consists of many components and the” assembly process” needs to be project managed in its entirety. That means windows, doors, roof, bath, toilet, paint, ceiling, glass, electrical hardware, etc. etc. needs to be planned ordered and supplied in order to avoid a “bottle neck” that would stop production creating “waste” resulting in an increase in cost. This in turn makes the product, the home, unaffordable to the majority of people.

    Through creative engineering and sophisticated manufacturing, moladi aims to advance living standards and spaces affordably. moladi is an advanced building technology that utilises an innovative re-usable plastic formwork system #plasticformwork to reduce the required skills to produce quality affordable homes and other structures that are socially acceptable by speeding up delivery and thus reducing cost. By emulating the methodology of the automotive assembly line, moladi implements the principles applied by Henry Ford; reducing cost by increasing production output by de-skilling the production operation, making homes affordable. #moladi

    Many people believe that if a house is produced, we have a customer. But, in Africa (and in the rest of the World) we need to create jobs for the customer in order for them to earn money, before they can actually buy the product. So, it is no use producing a house in a factory and trying to sell it to someone that doesn’t have an income or a job. Our focus and passion is to uplift the community by creating job opportunities producing homes" 

    Read more

    Reduce cost of Housing Construction 

    Insanity: Doing the same thing over and over agai expecting different results 

    Future of Construction - World Economic Forum

     

    moladi moulding mass housing

    "Produce moulds to produce components to produce formwork to produce houses to produce jobs to produce income to empower PEOPLE" - Hennie Botes

    Click on the link to view the interview conducted with Hennie Botes - Inventor and CEO of moladi - Link 

  • moladi classrooms for Gauteng Education Department

    moladi cast classrooms in record time

    moladi classrooms Gauteng strip

     

    Erect - Fill - Strip the next day. Two classroom with storage facilities (157 sqm). What a brilliant TEAM we have on site . All local labour that has never worked with moladi before . Our "teacher" taught them to produce this "superior" product in record time at a rate lower than conventional brick and mortar. The classroom project demonstration is key to the roll out in the education departments - Gauteng and all other provinces in South Africa - Thank you TEAM moladi !!!

    moladi classroom process

    #moladi #plasticformwork #classrooms #education #formwork

  • Slag use in building system offers multiple benefits

    Alternative construction system company Moladi has developed a means of incorporating mine slag into its Moladi mix, offering mining companies a viable method for recycling their waste material and reducing construction costs when developing mine-site accommodation.

    Moladi founder and CEO Hennie Botes explains that its cement admixture is poured into plastic moulds to form walls. “Using slag instead of sand in the mortar will result in substantial cost savings for mines during the construction of housing units and other site buildings.”

    Further, he notes that, with mines having problems disposing of mine slag, this solution will enable mines to use their waste material to build infrastructure.

    Business consultancy MJC Business Consulting director Marius Lotter adds that, traditionally, mines made use of conventional building methods to construct the various site buildings. However, he suggests that a lack of quality management, logistical challenges, rigid deadlines, theft as well as excessive costs – including those relating to the use and rental of various types of heavy machinery, the contracting of a skilled labour force and the use of labour intensive methods – have resulted in mines looking to alternative building technologies.

    Lotter notes that the Moladi system not only addresses most of the aforementioned issues but it also creates jobs. This assists mining companies with the legal obligation to, firstly, provide adequate housing and living conditions for staff and, secondly, “facilitate economic linkages to sectors other than mining” – which are the requirements in the 2010 Social and Labour Plan Guideline published by the Department of Mineral Resources.

    Lotter adds that Moladi has been successful in implementing its entry strategy for the mining industry and it “foresees that as many as 150 houses will be completed in 2017”.

    The company is also set to supply 150 staff accommodation units at an Mpumalanga project, which has already been approved, and is awaiting the approval of 22 000 units to accommodate staff at another mining project.

    Global Acclaim
    The company was featured in a World Economic Forum report called ‘The Future of Construction’, published in January, which forms part of a multiyear global economic initiative to guide and support the engineering and construction industry.

    The report notes that Moladi has an advantage over other affordable housing technologies, particularly those using prefabricated building components, because developing countries have notoriously inadequate road infrastructure, which makes transporting fully prefabricated units unviable and could result in the damage of prefabricated components. As Moladi’s system involves the use of lightweight plastic formwork, which is easily transported, it is unlikely to be damaged, regardless of road conditions.

    The system’s formwork is assembled by clipping together a set of injection-moulded, 30 cm × 10 cm × 20 cm plastic panels that are removable, reusable and recyclable. With this system, a building can be constructed in as little as two days.

    The formwork panels are assembled on the first day. Window and door frames, as well as piping and wiring are positioned within the wall cavity before the mould is filled with the Moladi mix.

    To illustrate the speed of the process, Botes explains that constructing a 40 m² house takes a team of 18 workers about four hours: two hours to erect the formwork and another two hours to pour the mortar.

    On the second day, the formwork is removed, the walls are painted with a cementitious water-based paint and the lighting and sanitary equipment are installed.

    The entire process can be monitored by one Moladi supervisor who provides on-site training and assistance to local workers with no prior construction experience or special construction skills.

    Moladi’s system is generally associated with small affordable housing units, but it can be applied to various infrastructure assets, including schools, hospitals or courthouses, site offices and multistorey buildings.

    Its main advantages are the speed and ease of production, the lower costs and reduced environmental impact, the quality of the end product and a localised supply chain that benefits local communities.

    The cast walls have a strength of between 7 N/mm² and 15 N/mm² – which is significantly stronger than traditional structures.

    The technology has undergone extensive testing and received certification from several African building and standards authorities, including the South African Bureau of Standards and the Tanzania Bureau of Standards. The structures are also reported to be “very earthquake resistant” according to tests conducted by the University of Panama.

    The system has been used to construct several thousand units in 20 countries in Africa, including South Africa, Nigeria and Tanzania. It has also been used in Sri Lanka, Mexico and Panama.

    Moladi is reportedly preparing to expand its footprint to include the UK and other industrialised countries that have a shortage of affordable housing. The report noted that one of the virtues of the Moladi system is that it can be easily adapted to local building codes and conditions by integrating the required reinforcing structures into the cast.

    It concludes that the system is limited to single- or two-storey buildings, but Moladi is working with engineers to upgrade its construction processes and mortar to qualify the use of its system for multistorey buildings.

    Read more - How Elon Musk and other pioneers (moladi) are shaking up the construction industry | World Economic Forum #WEF #moladi #Tesla #HennieBotes #ElonMusk https://www.weforum.org/agenda/2017/03/elon-musk-innovation-construction-industry/

    For more information visit www.moladi.co.za

  • moladi in Cameroon

    moladi invited to solve Cameroon housing crisis

    hennie botes cameroon

    Hennie Botes was invited to meet with Minister of Housing - Hon Jean Claude Mbwentchou of Cameroon in Yaoundé. The brief is to develop new villages - new towns - new cities A wonderful opportunity for moladi to design and develop Sustainable Integrated Human Settlements providing all amenities and services. Our team of professionals are geared to project plan the 106,000 homes throughout Cameroon. The uniqueness of the moladi building system allows for local unskilled labour to be trained to build their own homes, schools, clinics, shops etc.

    Cameroon President Paul Biya has earmarked housing as a priority for the citizens of his country. Again the advantage that moladi brings to the citizens of Cameroon is deemed to be a "Circular economy" Jobs for the unemployed - Food for the hungry - Homes for the homeless - Taxes for government. Development and funding of the project is part of the holistic approach of the moladi offering

    Read  more at - Future of Construction

    For more information visit www.moladi.co.za 

  • moladi revolutionizing the construction industry

    How to build social amenities faster and more affordably

    Future of construction moladi

    Future-of-construction-moladi

    Creating low-cost housing and social infrastructure is a challenge across the globe. A project to create much-needed courthouses in Tanzania may have shown a way ahead.

    The Moladi construction system replaces the cumbersome bricklaying process with an approach akin to injection moulding. Workers erect the building’s frame with reusable plastic panels, leaving wall cavities which – once the windows, doors, wiring and pipework have been put in – are filled with a fast-setting, aerated mortar.

    The building process can be monitored by just one qualified supervisor who manages local workmen with no prior construction experience or skills.

    The first project, Kibaha District Courthouse, was built for $250 per square metre, which is half the cost of conventional methods. It took six months to complete when it might typically have taken up to three years using traditional methods. On the back of this success, the Tanzanian government has committed to building another 11 district courthouses using this method.

    moladi - One of the world’s most innovative, scalable, affordable and socially accepted housing systems”

    building the future moladi

    Building the Future

    Relative to other industries, productivity in construction has stalled over the past 50 years. Technology was not making any fundamental advances, and companies remained averse to changing their traditional methods. Recently, however, transformative technological developments have emerged, and some pioneering firms have adopted them for current projects. These developments – moladi, 3D printing, building information modelling, wireless sensing and autonomous equipment, to name just a few – are already starting to turn traditional business models upside down.

     

    For more information on moladi visit - www.moladi.co.za 

Leave a comment