info@designmind.co.za 083 454 1620

logo

 

LOGIN INTO YOUR ACCOUNT

 

ARCHITECTURE & SPEC NEWS

All news Interior & Decor News Design News Landscape News Property News Build News
 
Monday, 28 September 2015 13:46

Virgin Active Shower Walls

Written by 
Rate this item
(0 votes)
Virgin Active Shower Walls| Virgin Active Shower Walls| Perspex|

Virgin Active Constantia renovates their shower cubicles utilizing Perspex for a durable, executive appeal

As Virgin Active is one of the most popular fitness establishments in South Africa, their changing facilities are utilized consistently by a considerable number of members. The shower cubicles therefore take quite a bit of strain on a daily basis, which unavoidably can lead to a significant amount of damage. To ensure that the cubicles always look good and to reduce the negative impact of the general wear and tear the materials used to build these facilities need to be of a high quality, long lasting and extremely durable.

Virgin Active in Constantia have experienced an excessive amount of breakages to their glass shower cubicles, in the male and female change rooms. They contacted Cubicle Solutions in May 2015 to look for an alternative solution that would reduce the damage and constant repair costs. Cubicle Solutions suggested a tailor-made, shower cubicle system that would be specifically adapted to flow with the existing showers and avoid having to re-fit the tiles. The cubicles were built using 12mm Perspex® Cast Acrylic for extra strength to provide the rigidity needed for reduced damage. Perspex® Cast Acrylic is a consistent, high quality and durable acrylic sheeting, making it the perfect material for a well-used facility and is used to bring life to the creative ideas of architects, specifiers, interior designers, furniture designers, brand architects, graphic designers, automotive designers and fabricators world-wide. They specifically selected the frosted white sheeting to ensure that the cubicles remained private and to provide an executive appeal to the overall look and feel of the change room.  

Cubicle solutions, together with Perspex completed the outstanding installation on deadline and Virgin Active Constantia was extremely happy with the overall solution and facelift to their change rooms. 

 

Additional Info

  • Source: Perspex
  • Website: http://www.perspex.co.za/
Read 1838 times Last modified on Tuesday, 29 September 2015 11:48

Related items

  • Industrial Building System

    Industrial Building Systems | Industrialized housing system

    Industrialized housing system

    Industrialized housing system

    The construction industry is undergoing a transitional change from an industry employing conventional technology to a more systematic and mechanized system. This new system is now known as the Industrialized Building System (IBS). This new method of construction can increase productivity and quality of work through the use of better construction machinery, equipment, materials and extensive pre-project planning. This study becomes very necessary since there is yet no organized body, which can provide the necessary information on the building cost comparison between the conventional system and industrialized building system in the construction industry. moladi plastic concrete formwork addresses the building cost comparison of the conventional system and industrialized building system of formwork system. It provides the details building cost between the conventional system and the formwork system and indicates which of the two is cheaper. The data were collected through questionnaire survey and case study, which consisting of institutional buildings. Through the statistical test it is shown that there is a significant difference in cost saving for the conventional system as compared to the formwork system (industrialized building system - IBS)

    Industrial Building Systems

    For more information visit www.moladi.co.za

    Keywords - Industrial Building Systems, Industrial Building Systems, Industrialized housing system, moladi, plastic formwork, formwork, building, system, industrial, Industrialized, housing, construction, technology, cost of construction

  • Waterproof a shower

    Failed or poor waterproofing is often to blame for tiling failures, leaks and costly repairs. Bear in mind that tiling itself is not inherently waterproof, and therefore it is essential to have properly detailed and installed waterproofing behind tiled surfaces.

    TAL shares practical advice on how to waterproof a shower with TAL’s Sureproof flexible and seamless rapid-setting two-component waterproofing system.

    GOOD TO KNOW: Allow plenty of time to complete this project, as the waterproofing system requires about 24 hours to dry before tiling can commence.

    Preparation

    Start the process by priming the surface and ensure it is in good condition, clean and dry, and has a moisture content of less than 5%. If necessary, the shower surface can be shot-blasted to give the tile adhesive extra grip, before being sealed with a layer of TAL Floor Primer. If the existing surface is dense and smooth, apply a slurry comprising TAL Floorkey and TAL Rapidfix.

    1. It is important to allow for any movement. Apply a 10mm bead of sanitary silicone to all internal corners and joints around the floor waste, taps and rose plumbing.

    2. Combine the two ingredients of TAL Sureproof together. Use a mechanical mixer or attach a mixer to your drill.  Add the powder to the liquid and mix until a creamy, lump-free consistency is obtained. Allow the mix to stand for three minutes and then stir again.

    3. Apply the first coat of TAL Sureproof to the wall and floor corners. Immediately bed the TAL Sureproof Membrane (200mm wide) into the wet Sureproof [see below]. The Sureproof Membrane must be pushed into the corners, ensuring the entire interface is covered with the membrane. Ensure there are no wrinkles or air bubbles trapped beneath the membrane.

    4. Apply a second coat of TAL Sureproof to saturate the membrane completely before the first coat dries.

    5. Where the waste is flush with the floor, place the membrane around and down into the waste.

    6. For the main shower wall and floor surfaces, apply the first coat of TAL Sureproof to the dry, primed surface with a short hair paint roller or brush, and allow approximately two hours to dry. Apply the second coat in a different direction to ensure complete coverage, avoiding air entrapment or pinholes. Allow the TAL Sureproof system to dry for 24 to 36 hours before fixing the tiles.

    When tiling, modify the tile adhesive and grout with TAL Bond Powder or Bond Liquid to add flexibility and water resistance to the tiling installation, and apply a silicone sealer to all the perimeter joints.

    GOOD TO KNOW: Use of the shower is not recommended for 72 hours after completion of the tiling to ensure that the installation has cured fully.

    As a final touch, seal the grout joints with TAL Grout Sealer. This will ensure your newly-installed shower not only looks good, but is also easy to clean. If in any doubt visit www.tal.co.za

  • Kohler Launches the Easy-To-Use DTV Prompt Digital Showering System for Enhanced, Personalized Hydroptherapy

    Modern life has its demands. Whether you are tired, stressed or still a bit asleep, a good shower is the perfect way to relax, re-energize or wake you up at the start of your day.  In this regard, hydrotherapy is the perfect experience, provided you have the right equipment. DTV Prompt by Kohler is just the answer.

    Intuitive, simple-to-use, versatile, customizable and easy-to-install, DTV Prompt offers multiple bathing and showering solutions to meet an array of expectations.

    zaa99108 S

    Smart

    The interface presents an elegant, restrained design and 4 features:

    • Warm-up mode feature. Once the desired temperature is reached, the water pauses until you are ready to step into the shower.
    • Countdown mode feature sets the duration of the shower to manage water use and time (4 to 12 minutes).
    • Pause feature lets you pause water flow for up to two minutes (wash your hair), Temperature control limits the maximum temperature for guaranteed safe, family use, thanks to the thermostatic valve.

    User-friendly

    Easy-to-read, large, intuitive LCD display and buttons: On/pause/off, diverter and temperature control (red or blue arrows).

    Versatile

    DTV Prompt’s integrated diverter lets you toggle between water outlets, or run them both simultaneously, thus offering multiple configurations.

    For example, you can use together showerhead and bath filler, showerhead and handshower, handshower and side body sprays, handshower and bath filler or showerhead and bath sprays. Other combinations are possible…as you like them.

    Customizable                                                           

    The system allows the user maximum customization with different parameter settings.

    Time can be set to a 12- or 24-hour clock. Temperatures can be displayed in Celsius or Fahrenheit.  If desired, the Preheating mode can start up when you push the “On” button. You choose the number of water outlets (A or B) and the diverter can be configured onto outlets A or B, or A + B.

    The system delivers up to 50 l/min at 3 bars (30 l/min for a single outlet) for a quick bath fill or a multiple spray shower.

    Easy to install

    Last of all, DTV Prompt is easy to install: the interface connects to the thermostatic valve by a standard phone cord (comes with a 6-meter cable) and mounts to the wall surface. An integrated 12V transformer connects to the power supply.

     Screen Shot 2016-04-08 at 12.19.02 PM

     

    About Kohler Co.
    Founded in 1873 and headquartered in Kohler, Wisconsin,
    Kohler Co. is one of America’s oldest and largest privately held companies comprised of more than 30,000 associates. With more than 50 manufacturing locations worldwide, Kohler is a global leader in the manufacture of kitchen and bath products; engines and power systems; premier furniture, cabinetry and tile; and owner/operator of two of the world’s finest five-star hospitality and golf resort destinations in Kohler, and St Andrews, Scotland. 

  • Live Wall Cladding

    Live Wall Cladding

    Introduction

    Moby Deck & Liqui-Tec Decor Projects has partnered with Designer Rock to launch a new and never seen before wall finishing product that has been designed and meticulously crafted to set new heights in the Decor industry with cosmetic allurement. We believe we have accomplished just that.

     

    What Is Live Wall Cladding

    Live Wall Cladding is exactly as the name suggests, wall cladding that comes alive... By the push of a button on your hand held remote, your wall cladding will come alive with illuminating colour and shimmering innovation.

     

    Application

    Live wall cladding can be used as a wall finishing product in most applications.

    To name a few, but not limited to, as follows:

    Residential

    -Exterior Wall Cladding-

    -Interior Wall Cladding-

    -Entertainment Areas-

    -Garden Retainer Walls-

    -Structural & Non-Structural Pillars-

    -Room Divider & Wall Partition Panels can also be made-

    Commercial

    -Reception Wall Decor-

    -Office Interior Walls & Partitions-

    Retail

    -Shopping Centres & Malls-

    -Restaurants-

    -Hotels-

    -Casinos-

  • Embodied Energy in Construction Materials

    Embodied Energy

    Embodied Energy is the sum of all the energy required to produce any goods or services, considered as if that energy was incorporated or 'embodied' in the product itself. The concept can be useful in determining the effectiveness of energy-producing or energy-saving devices, or the "real" replacement cost of a building, and, because energy-inputs usually entail greenhouse gas emissions, in deciding whether a product contributes to or mitigates global warming. One fundamental question is: does the device produce more energy or save more energy than it took to make it?

    Embodied energy is an accounting method which aims to find the sum total of the energy necessary for an entire product life-cycle. Determining what constitutes this life-cycle includes assessing the relevance and extent of energy into raw material extraction, transport, manufacture, assembly, installation, dis-assembly, deconstruction and/or decomposition as well as human and secondary resources. Different methodologies produce different understandings of the scale and scope of application and the type of energy embodied.


    Keywords - moladi, energy, embodied energy, construction materials, production, homes, sustainable, green, zero energy, life-cycle, aluminium, cement, concrete, steel, wood, prefab, insulation, thermal properties

Leave a comment